铁路既有线改造工程湘潭站通信传输施工方案探讨 被引量:3

Construction schemes of communication transmission for Xiangtan Station of railway existing line modification project
下载PDF
导出
摘要 依据铁路总公司和广铁(集团)公司要求,对湘潭站进行改造并扩建,通信也要求进行相应改造。既要保证铁路通信不中断,又要按规定时间进行运输通信转楼,难度非常大,本文介绍湘潭站改扩建工程通信改造方案的设计、施工和割接实施,对如何筛选方案和正确组织施工进行探讨,实践证明,方案和施工组织切实可行,顺利开通了通信业务。 The article introduced the design, construction and implementation of communication transmission for Xiangtan Station of railway existing line modification project. According to the requirements of China Railways and Guangzhou Railway(group)Company, the communication at Xiangtan Station was also needed to reform. It was very difficult to both ensure uninterrupted railway communication, and keep communication time for transportation in accordance with the regulations. This paper discussed how to select the scheme and organize the construction correctly. Practice proved that the scheme and construction organization were feasible, the communication business was smoothly opened.
作者 钟磊
出处 《铁路计算机应用》 2015年第12期50-53,共4页 Railway Computer Application
关键词 湘潭站通信 方案 实施 communication at Xiangtan Station scheme implementation
  • 相关文献

参考文献2

  • 1中华人民共和国铁道部.铁路技术管理规程[S].10版.北京中国铁道出版社,2011.
  • 2中华人民共和国铁道部.TBl0205-99铁路通信施工规范[S[.北京:中国铁道出版社,1999.

同被引文献9

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部