海洋平台大直径钢管桩打桩过程有限元分析研究 被引量:6

Finite element analysis on large diameter steel pipe pile driving of offshore platform
下载PDF
导出
摘要 近年来海上工程的规模越来越大,为了满足工程需要,桩基设计常常采用大直径,大长度的钢管桩。打桩过程是个相当复杂的过程,不仅涉及到几何非线性、材料非线性、边界非线性,而且是个动力过程。有限元法在处理打桩分析方面具有很强的优势,采用PLAXIS对不同条件下的打桩问题进行了动力模拟分析。分析显示在打桩过程中,桩端土体会产生较大的水平位移和竖向位移,桩端土体和靠近桩端的部分土塞内会产生较大的超孔隙水压力。在砂土中,停锤较短时间也会使孔压迅速消散,这也是打桩中间的停锤会造成后续打桩困难的主要原因。 In recent years, with the development of offshore engineering, large diameter and deep penetration steel pipe pile foundations are often used in practice. Pile driving is a rather complex process, which involves not only the geometric nonlinear, material nonlinear, boundary nonlinear, but also dynamic analysis. Finite element method has advantages in dealing with this problem. In this study, PLAXIS was adopted to simulate dynamic analysis of pile driving under different conditions. Analysis resuhs show that in the process of pile driving, large horizontal displacement and vertical displacement of the soils at the pile tip may occur, and great excess pore water pressure may appear in the soils at pile tip and soil plug near pile end. In sand, driving suspending with short time also makes pore pressure dissipate rapidly, which is the main reason causing driving difficulties after installation delay.
作者 刘剑涛 李飒
出处 《海洋工程》 CSCD 北大核心 2015年第6期90-94,共5页 The Ocean Engineering
关键词 海洋平台 大直径钢管桩 打桩 有限元分析 动力分析 offshore platform large diameter steel pipe pile pile driving finite element analysis dynamic analysis
  • 相关文献

参考文献6

  • 1FRANK R,SCOTT W.Behavior of cylinder piles during pile installation[C]//Contemporary Issues in Deep Foundations,Geotechnical Special Publication No.158,ASCE.2007:1-13.
  • 2WALTON P A,BORG S L.Using dynamic pile testing to evaluate quality and verify capacity of driven piles[C]//Transportation Research Record No.1633.1998:117-119.
  • 3李飒,韩志强,杨清侠,周扬锐,蒋宝凡.海洋平台大直径超长桩成桩机理研究[J].工程力学,2010,27(8):241-245. 被引量:23
  • 4MALHOTRA S.Axial load capacity of pipe piles in sand:revisited[C]//Deep Foundations 2002.2002:1230-1246.
  • 5FINNO R J,et al.Summary of pile capacity predictions and comparison with observed behavior[C]//Predicted and Observed Axial Behavior of Piles:Results of a Pile Prediction Symposium.1989:356-385.
  • 6蒲玉成.海洋平台非连续打桩过程的有限元动力分析[J].港工技术,2013,50(1):43-45. 被引量:2

二级参考文献21

  • 1樊之夏.海上打桩拒锤风险分析.中国造船,2006,47:411-414.
  • 2Soderberg L O. Consolidation theory applied to foundation pile time effects [J]. Geotechnique, 1961, 11(3): 217-225.
  • 3Samson L, Authier J. Chang in pile capacity with time: Case histories [J]. Canadian Geotechnical Journal, 1986, 23(1): 174- 180.
  • 4Lukas R G. Bushell T D. Contribution of soil freeze to pile capacity [C]//Fred H K. Foundation Engineering: Current Principles and Practices: Proceedings of the Congress, New York: ASCE, 1989.
  • 5Bullock P J. Pile friction freeze: A field and laboratory study [D]. Florida: University of Florida, 1999.
  • 6Chowm F C, Jardine R J, Brucy F, Nauroy J F. Effects of time on capacity of pipe pile in dense marine sand [J]. Journal of Geotechnical and Geoenvironmental Engineering, 1998, 124(3): 254-264.
  • 7Van E K, Incorporating set-up and support cost distributions into driven pile design [C]//Jerry A D, Mohamad H H. Current Practices and Future Trends in Deep Foundations. New York: ASCE, 2004,.
  • 8Finno R J, Achille J, Chen H C, Cosmao T, Park J B, Picard J N, Smith D L, Williams G E Summary of pile capacity predictions and comparison with observed behavior [C]//Finno R J. Predicted and Observed Axial Behavior of Piles: Results of a Pile Prediction Symposium, New York: ASCE, 1989.
  • 9Malhotra S. Axial load capacity of pipe piles in sand: revisited [C]//Michael W O, Frank C T. Deep foundations 2002. New York: ASCE, 2002.
  • 10Randolph M F, Carter J P, Wroth C E Driven piles in clay-The effects of installation and subsequent consolidation [J]. Geotechnique, 1979, 29(4): 361-393.

共引文献23

同被引文献35

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部