摘要
为研究系杆拱桥的吊杆在初张拉中的受力状态,用MIDAS建立全施工过程三维杆系模型,计算在张拉中各吊杆受力状态;张拉完成后用索力仪测出吊杆的受力,对比分析结构的受力状态。论文提出施工技术措施,给出理论计算值,优化结构体系受力状态。
To study tension of Tied Arch Bridge a boom at the beginning of the stress state,use MIDAS to establish three-dimensional model of the whole construction process Bars.Calculate tension stress state of each boom.Then use cable force in post-tensioning complete instrument measured the force boom,and comparative analysis of the stress state structures.In this paper,construction technical measures,given the theoretical value,optimize the structure of the system state by force.
出处
《工程建设与设计》
2016年第1期76-78,共3页
Construction & Design for Engineering
关键词
系杆拱桥
初张拉
索力优化
tied-arch bridge
initial tensioning
cable forces optimization