大伙房水库输水工程D/B1施工段F_3断层技术总结 被引量:1

Summary of F_3 fault technology on D/B1 construction section in Dahuofang Reservoir Water Conveyance Project
下载PDF
导出
摘要 大伙房水库输水工程施工段F3断层的开挖及支护严格遵循新奥法,且在开挖过程中,各种地质预报方法及监控量测得到了充分的应用,确保了施工的安全,提高了施工的工程质量,同时验证了上述方法的优缺点,本文对此进行了介绍,并对F3断层技术进行了总结。 New Austrian Tunneling Method is strictly followed in excavation and supporting of F3 fault on construction section in Dahuofang Reservoir water conveyance project. In addition,various geological forecast methods and monitoring measurements have been fully used in the process of excavation,thereby ensuring construction safety,improving project quality of the construction,and verifying advantages and disadvantages of the above methods synchronously. In the paper,the above contents are introduced. F3 fault technology is summarized.
作者 赵福成
机构地区 辽宁省水利厅
出处 《水利建设与管理》 2015年第12期4-7,共4页 Water Conservancy Construction and Management
关键词 断层 TSP超前地质预报 监控量测 新奥法 大伙房水库输水工程 fault TSP advance geological forecast monitoring measurement New Austrian Tunneling Method Dahuofang Reservoir water conveyance project
  • 相关文献

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部