期刊文献+

双转子互换高背压改造叶片安全评估 被引量:2

Safety Assessment of High Back-pressure Retrofit Blade with Double Rotors Swap
下载PDF
导出
摘要 汽轮机在供热期和非供热期采用双低压转子互换,是实现高背压供热改造的一个行之有效的手段。采用双转子互换的高背压改造方案,除了系统结构方面的考虑外,仍需要对采暖期的低压去级转子的末叶进行安全性评估,以保证其能满足末级叶片高背压运行的要求。文章着重分析了高背压末叶安全性的考虑因素,并对叶片可能的颤振风险进行了论证。 Using double low pressure rotors swap in the heating period and non-heating period is an effective mean to achieve high back-pressure retrofit. The retrofit scheme of double LP rotors swap, besides the consideration of system structure, still needs to make safety assessment of the last stage blade during the heating period, to ensure meet the requirement of the last stage blade high back-pressure operation. This paper analyzes the safety factor of the last stage blade in the high back-pressure and the potential risk of blade flutter.
出处 《东方汽轮机》 2015年第4期13-16,共4页 Dongfang Turbine
关键词 高背压改造 双转子互换 末叶 颤振 high back-pressure retrofit double rotors swap last stage blade flutter
  • 相关文献

参考文献3

二级参考文献5

共引文献36

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部