摘要
结合工程实例,介绍了水泥稳定碎石基层的施工工艺流程,从施工准备、施工放样、运输、摊铺、碾压等方面,论述了水泥稳定碎石基层的施工要点,并提出了施工质量控制措施,保证了路面的使用性能和使用年限。
Combining with engineering examples,the paper introduces the construction technology procedures of cement stabilized gravel base,discusses construction points of cement stabilized gravel base from aspects of construction preparation,construction sampling,transportation,paving and rolling,and puts forward construction quality control measures,guarantees pavement utilization performance and serving life.