摘要
结合山区桥梁地形、地质情况及现有的施工方法,选取贝雷梁钢管柱柱式支架法作为现浇箱梁施工方法,并制定相应的施工方案,利用Midas civil软件建立了整体方案模型,对支架进行了受力分析,确保了方案的安全性与经济性。
Combining with mountainous bridge morphology,geological conditions and current construction methods,the paper selects bailey-beam steel-pipe column bearing method as cast-in-situ box girder construction methods,formulates corresponding construction scheme,establishes integral scheme model and analyzes the bearing stress by applying Midas civil software,and finally ensures the scheme safe and economic.
出处
《山西建筑》
2016年第2期175-177,共3页
Shanxi Architecture