摘要
新疆天池能源南露天煤矿一期10.0 Mt/a地面生产系统初步设计中外运方式以火车装运为主(设计能力5 000 t/h),通过对现有地面生产系统装车工艺中为火车装车站上料胶带机中部增设犁式卸料器进行卸料,用以释放存料,优化了装车工艺。
The outward transportation way is mainly train shipment in 10.0 Mt/a ground production system preliminary design of Tianchi Energy South Open-pit Coal Mine(design capacity of 5 000 t/h). By unloading the plough unloader for train loading station on the tape machine in the existing ground production system loading technology, the mine can release material and optimize the loading process.
出处
《露天采矿技术》
CAS
2015年第12期1-2,7,共3页
Opencast Mining Technology
关键词
存煤安全
工艺优化
物料分流
coal safety
technology optimization
diversion of material