期刊文献+

既有线GSM-R改造中既有传输系统配置运用方案 被引量:1

Existing Transmission System Confi guration Scheme in Reconstruction of GSM-R System for Existing Lines
下载PDF
导出
摘要 既有线无线列调改造为GSM-R系统后,能大大提高列车无线调度通信运用质量,传输系统作为承载网络,在既有线GSM-R改造工程中需满足GSM-R系统及其他既有和新增业务承载需求。结合呼和浩特铁路局大包线GSM-R改造工程,简谈既有线GSM-R改造中既有传输系统配置运用方案。 When GSM-R system is used in reconstruction of existing lines, it will greatly improve the wireless train dispatching communication quality. As the bearing network, the existing transmission system needs to meet requirements of GSM-R system and other existing and new businesses in reconstruction. Combined with reconstruction of the GSM-R system for Datong-Baotou line of Hohehot Railway Administration, the paper introduces the existing transmission system configuration scheme in reconstructing GSM-R system for existing lines.
作者 苗淼
出处 《铁路通信信号工程技术》 2015年第6期40-43,共4页 Railway Signalling & Communication Engineering
基金 中国铁路总公司重点课题项目(2014X005-G)
关键词 GSM-R 传输系统 配置运用 GSM-R transmission system configuration and application
  • 相关文献

参考文献2

  • 1铁总建设[2014]62号铁路通信线路、传输及接入网设计规范[s].
  • 2北京全路通信信号研究设计院有限公司.呼和浩特铁路局大包线无线列调改造GSM-R系统工程可行性研究[z].2014.

共引文献1

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部