摘要
结合长沙枢纽GSM-R网络优化工程经验,介绍分析新建杭长、长昆客专与既有武广客专联调联试期间GSM-R网优的相关问题,并且提出网优实施作业和验证测试方案。
The paper introduces and analyzes the related issues of GSM-R network optimization in the process of integrated commissioning and testing among new Hangzhou-Changsha dedicated passenger line (DPL), Changsha-Kunming DPL and the existing Wuhan-Guangzhou DPL, and puts forward the implementation and verification plans of the network optimization combining with the project of GSM-R network optimization of Changsha junction.
出处
《铁路通信信号工程技术》
2015年第6期48-51,共4页
Railway Signalling & Communication Engineering
基金
中国铁路通信信号股份有限公司重点工程项目(2300-G3130075.02)
关键词
GSM-R网优
长沙枢纽
实施
GSM-R network optimization
Changsha junction
implementation