摘要
分析与研究煤矿掘进机拐90°直角弯施工工艺。结合使用掘进机的多年经验,查找资料等多方面对掘进机拐90°弯的一些常见施工困难,包括:开帮、顶板维护、设备的调整,进行了分析与研究。
This paper is designed for underground tunneling machine Abduction 90 ° right angle bend construction technology analysis and research. Combined with my experience, this paper analyzes and studies some common construction difficulties including: wall caving, roof maintenance, adjustment equipment to find information and other aspects of the TBM Abduction 90 ° bend.