期刊文献+

工程管理组织内部知识共享影响因素的实证研究 被引量:3

Empirical Research on the Knowledge Sharing Influence Factors Within the Project Management Organization
下载PDF
导出
摘要 通过文献研究和理论假设,从主体因素、客体因素和环境因素3个维度,构建了工程管理组织内部知识共享效果的影响因素模型。通过开发测量量表,编制调研问卷,开展广泛调研,并利用SPSS统计分析软件对调研数据进行了描述性统计分析、信度和效度分析、相关分析以及回归分析,并对研究假设进行了实证检验。研究结果表明:成员间信任、组织文化和领导支持等对工程管理组织内部知识共享效果具有显著的正向影响,而知识内隐性、成员间差距和组织单元独立性等对工程管理组织内部知识共享效果具有显著的负向影响。 Through literature research and theoretical assumptions,this paper sets up an influencing factors model of knowledge sharing within the project management organization from three dimensions including main factors,object factors and environmental factors. Through developing measurement scales,drawing up the questionnaire survey,carrying on extensive research,and executing the descriptive statistical analysis,reliability and validity analysis,correlation and regression analysis about the research data using SPSS software,the paper tests the research hypothesis. Results show that the trust among members,organizational culture and leadership support affect the knowledge sharing within the project management organization significantly and positively,and the hidden features of the knowledge,difference among members,and independence of organizational unit have impact on the knowledge sharing within the project management organization significantly and negatively.
出处 《工程管理学报》 2015年第6期27-32,共6页 Journal of Engineering Management
基金 中央高校基本科研业务费专项资金资助项目(2013W22) 江苏省高校哲学社会科学基金项目(2015SJD434)
关键词 工程管理组织 知识共享 相关性 回归分析 project management organization knowledge sharing correlation regression analysis
  • 相关文献

参考文献20

二级参考文献172

共引文献119

同被引文献44

  • 1丁传波,黄吉欣,方东平.我国建筑施工伤亡事故的致因分析和对策[J].土木工程学报,2004,37(8):77-82. 被引量:76
  • 2李超平,时勘.变革型领导的结构与测量[J].心理学报,2005,37(6):803-811. 被引量:459
  • 3李军.知识型员工的特征及其激励[J].科技进步与对策,2007,24(11):124-127. 被引量:34
  • 4Ribeiro FL. Enhancing knowledge management in contraction firms[J]. Construction Innovation, 2009, 9 (3): 268-284.
  • 5Forcada N, Fuertes A, Gangolells M, Casals M, Macarulla M. Knowledge management perceptions in construction and design companies[J]. Automation in Construction, 2013, 29: 83-91.
  • 6Amabile TM. Creativity in context[M]. Boulder, Colorado : Westview Press, 1996.
  • 7Todorovid ML, Petrovid DI2, Mihid MM, Obradovi6 VL, Bushuyev SD. Project success analysis framework: A knowledge-based approach in project management[J]. International Journal of Project Management, 2015, 33 ( 4 ): 772-783.
  • 8Sung SY, Choi JN. Effects of team knowledge management on the creativity and financial performance of organizational teams[J]. Organizational Behavior and Human DecisionProcesses, 2012, 118 (1): 4-13.
  • 9Reich BH, Gemino A, Sauer C. Knowledge management and project-based knowledge in it projects: A model and preliminary empirical results[J]. International Journal of Project Management, 2012, 30 (6): 663-674.
  • 10Choi JN, Anderson TA, Veillette A. Contextual Inhibitors of Employee Creativity in Organizations: The Insulating Role of Creative Ability[J]. Group and Organization Management, 2009, 34 (3): 330-357.

引证文献3

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部