彭水水电站14号坝段渗漏处理及分析 被引量:2

Analysis on seepage treatment at section No.14 of Pengshui dam
下载PDF
导出
摘要 彭水水电站大坝为碾压混凝土弧形重力坝。自蓄水以来,在冬季低温高水位情况下,14号坝段坝后274 m高程层间缝出现渗漏,并于第二年4月份左右消失。为此对渗漏原因进行了分析,拟定了处理措施。2010年底对13~14号坝段之间横缝进行了化学灌浆处理,2013年初对14号坝段进行了水泥灌浆处理,通过两次防渗治理,14号坝段坝后渗漏问题基本得以解决。 Pengshui hydropower dam is a RCC arch gravity dam. In the case of low temperature andhigh water level, seepage of interbedded joint at elevation 274 m behind section No.14 was observed inwinter after impoundment, and disappeared in April of second year. This paper analyzed the seepage rea-son and proposed treatment measures. Chemical grouting for transverse joint between section No.13 andNo.14 was performed at the end of 2010, and cement grouting for section No.14 was conducted in early2013. By these methods, the seepage problem behind the section No.14 was basically solved.
作者 于海龙
出处 《大坝与安全》 2015年第6期31-33,41,共4页 Dam & Safety
关键词 灌浆处理 渗漏 14号坝段 彭水水电站 grouting treatment seepage section No.14 Pengshui hydropower station
  • 相关文献

参考文献3

  • 1江兴南,李涛.高岭头一级水电站大坝坝基渗漏处理及效果分析[J].大坝与安全,2010,24(2):57-59. 被引量:3
  • 2刘晖,卢金龙,曾晖.重庆乌江彭水水电站蓄水安全鉴定设计自检报告[R].武汉:长江水利委员会长江勘测规划设计研究院,2007.
  • 3国家电力监管委员会大坝安全监察中心.2012年度彭水水电站水工技术监督汛前现场检查报告[R].杭州:国家电力监管委员会大坝安全监察中心,2012.

共引文献2

同被引文献17

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部