摘要
天生桥二级电站调压井建成后,调压井闸门下落时常发生脱轨、卡槽等事故,需要改造。笔者介绍了改造的设计思路及施工中遇到的困难及解决方案,为其他同类型的改造施工提供详实的可借鉴的实践经验。
After the completion of surge tank in Tianshengqiao Ⅱ hydropower station, derailment, block-ing and other accidents often occurred when the gate of surge tank went down, so the modification wasurgently needed. This paper introduced the design, construction difficulty and relevant solving method,worthy reference.
出处
《大坝与安全》
2015年第6期59-62,共4页
Dam & Safety
关键词
调压井
事故检修闸门
技术改造
钻孔植筋
混凝土拆除
surge tank
emergency overhaul gate
technology modification
boring and planting steel bar
concrete demolishment