摘要
介绍了湖南水口山有色金属集团公司第八铅冶炼厂30 t/h化学水处理站的运行及改造情况。试生产期间,由于实际原水质量比设计所依据的水质差,化学水处理站生产出现了诸多问题,不能满足生产要求。对出现的问题进行分析,提出了相应的技术改造措施,改造后获得了满意的结果。
The operation and technology improvement of a 30 t / h chemical water treatment plant in the Eighth Lead Metallurgical Plant of Hunan Shuikoushan Nonferrous Metals Group Co.,Ltd. arte introduced. Many problems occurred during the trial due to the poor quality of raw water than that of the designed specification. The treatment couldn’t meet the requirements. The technology improvement based on the analysis showed satisfactory result of water treatment.
出处
《硫酸工业》
CAS
2015年第6期44-46,共3页
Sulphuric Acid Industry
关键词
化学水处理站
运行
改造
chemical water treatment plant
operation
improvement