摘要 为解决连续采煤机块段式开采工作面顶板难以管理的问题,实现连续采煤机开采工作面顶板可按照一定规律有序垮落,提出了煤柱支护技术、支架切顶技术、卸压爆破强制放顶技术,同时对工作面三角区顶板的控制技术进行了分析。应用结果表明:通过留设采硐间煤柱、支巷口保护煤柱以及区段保护煤柱,在采硐开口位置采用梯子梁或工字钢并补打锚索加强支护等措施,可有效管理顶板;而且,采用支架切顶技术、支巷深孔爆破强制放顶技术及边界顶板爆破卸压技术能够合理控制顶板垮落。 In order to solve the difficult roof control problem of block and sectional mining face with continues miner and to realize the ra- tionally falling with certain law of the roof above the continuous miner mining face, a coal pillar support technology, roof cutting technology with the powered supports and forced roof falling technology with the pressure releasing and blasting were provided, meanwhile, an analysis was conducted on the roof control technology of the delta block in the coal mining face. The application results showed that with the coal pillar left between the mining chambers, protective coal pillars at the gateway branch and sectional protective coal pillars, the ladder beam or H type steel bar and anchor reinforced support and the other measures applied to the opening location of the mining chamber couht ef- fectively control the roof. Also the applications of the powered support roof cutting technology, deep borehole blasting forced roof falling technology of the gateway branch and roof blasting technology at the face boundary could rationally control the roof falling.
作者 江小军
出处 《煤炭科学技术》 CAS 北大核心 2015年第12期36-39,共4页 Coal Science and Technology
基金 国家自然科学基金资助项目(51574154 51344009) 山东省优秀中青年科学家科研奖励基金资助项目(BS2012NJ007) 矿山灾害预防控制省部共建国家重点实验室培育基地开放课题基金资助项目(MDPC2013KF12)
关键词 顶板控制 块段式开采 支架切顶 三角区顶板 连续采煤机 roof control block and sectional mining roof cutting with hydraulic powered support roof of delta block continues miner
  • 相关文献

参考文献14

二级参考文献54

共引文献147

同被引文献47

引证文献7

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部