摘要
总结新钢第二炼铁厂对主上料皮带机的运行管理和维护工作,保障了高炉正常生产。
The operation management and maintenance work are summarized for primary belt conveyor in Second Ironmaking Plant to guarantee the normal production of blast furnace in Xinyu Steel.
出处
《江西冶金》
2015年第6期28-30,共3页
Jiangxi Metallurgy
关键词
主上料皮带机
点巡检
运行维护
primary belt machine
routing inspection
operation maintenance