Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge

Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge
下载PDF
导出
摘要 The formwork and falsework in the construction of twin ribbed slab decks on a multi-span ecological bridge for a dual carriageway are presented. The bridge is situated in a valley plain which is crossed by small rivers and was designed principally with the environment in mind. The bridge length is over 356 m, and the width of the decks is 11.5 m. For the bridge works, a simple conventional falsework system was chosen with steel frames for the supports and steel rolled beams for the decks. The formwork was constructed in solid timber and plywood as multiple-use panels. The falsework was designed in order to build the two 10-span bridge decks in stages. The decks are continuous cast-in-situ prestressed concrete twin rib with spans of 30 m, 34 m and 45 m. An individual falsework system was designed, which was easy to move transversally following completion of each stage for one deck. After finishing each stage, for the second deck, the falsework was dismantled and used again in the next construction fronts. An individual arrangement for the falsework along with timber pilings was used to cross the biggest river. The formwork timber panels were used several times in the multistage bridge construction. The adopted falsework system is very simple, but it allowed the speedy construction of the two decks where there were severe time constraints.
出处 《Journal of Civil Engineering and Architecture》 2015年第12期1432-1438,共7页 土木工程与建筑(英文版)
关键词 Prestress concrete bridge continuous bridge twin rib deck span-by-span construction FORMWORK falsework. 支架系统 预应力混凝土梁桥 桥梁工程 施工阶段 现浇预应力混凝土 面板设计 脚手架 桥面宽度
  • 相关文献

参考文献10

  • 1Benaim, R. 2008. The Design of Prestressed Concrete Bridges, Concepts and Principles. London and New York: Taylor & Francis.
  • 2Hewson, N. 2012. Prestressed Concrete Bridges, Design and Construction. London: Thomas Telford.
  • 3fib (f6d6rationinternationale du b6ton). 2009..fib Bulletin 48, Formwork and Falsework for Heavy Construction. Lausanne:fib.
  • 4Weidemann, H. 1984. The Concrete and Prestressed Construction of Reinforced Concrete Girder Bridges. D~sseldorfi Werner-Verlag. (in German).
  • 5Wittfoht, H. 1984. Building Bridges, History, Technology, Construction. Dtisseldorf: Beto-Verlag.
  • 6Holst, K. H., and Holst, R. 2004. Reinforced Concrete and Prestressed Concrete Bridges--Design, Construction and Analysis. Berlin: Ernst & Sohn.
  • 7Ho~owaty, J. 2009. "Bridge Falsework in Construction of Approach Viaducts for the Regalica Bridge Crossing in Szczecin." In2ynieria i Budownictwo 8: 44l-5. (in Polish).
  • 8Ho~owaty, J. 2013. "Falseworks for Concrete Bridge Construction in Subsidence of Soft Soils in Szczecin." Presented at CCC 2013~entral European Congress on Concrete Engineering--Concrete Structures in Urban Areas, Wroctaw, Poland.
  • 9Holowaty, J., and Jurkowski, D. 2015. "Timber Formwork for Concrete Bridge Construction." Bridges 1: 26-8. (in Polish).
  • 10Holowaty, J. 2013. "Partial Collapse of Bridge Falsework and Sal-,'age Technique." Presneted at 5th ICE (International Conference on Forensic Engineering) 2013: "Informing the Future with Lessons from the Past", London, UK.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部