3Brown G G,Cormican K J,Lawphongpanich S,Widdis D B.Optimizing submarine berthing with a persistence incentive[J].Research Logistics,1997,(44):301-318.
4Imai A,Nagaiwa K.Efficient planning of berth allocation for container terminals in Asia[J].Journal of advanced Transportation,1997,31(1):75-94.
5Eberhart R C,Shi Y H.Particle Swarm Optimization:Development,Applications and Resources.Proceedings of 2001 Congress on Evolutionary Computation,Seoul,korea,2001[C] ,81-86.
6Jerald.J,Asokan.P,Prabaharan.G,et al.Scheduling Optimization of Flexible Manufacturing Systems Using Particle Swarm Optimization Algorithm[J].Advanced Manufacturing Technology.2004,213-220.
7LAI K K,LEUNG J. Analysis of gate house operations in a container terminal [ J ]. International Journal of Modelling and Simulation,2000,20(1 ) :89 -94.
8DAS S K, SPASOVIC L. Scheduling material handling vehicles in a container terminal [ J ]. Production Planning and Control, 2003,14(7) :623 -633.
9BISH E K,LEONG T. Analysis of a new vehicle scheduling and location problem[J]. Naval Research Logistics,2001,48(5) :363 -385.
10BISH E K. A multiple-crane-constrained scheduling problem in a container terminal [ J ]. European Journal of Operational Research,2003,144( 1 ) :83 - 107.