基于FCE的桥梁运营阶段风险分析 被引量:1

Risk estimation in bridge operation stage based on fuzzy comprehensive evaluation
下载PDF
导出
摘要 为了对桥梁事故进行源头管理,提高桥梁运营阶段的安全性,从风险发生机理出发,建立了风险评估模型、风险接受准则和风险等级评价标准.考虑到风险损失的不确定性和模糊性,将模糊数学方法与层次分析法相结合构建了基于模糊综合评判(FCE)的失效后果评价方法,使风险损失量化,从而客观地对桥梁运营期风险进行评价.实例证明该方法具有可行性和有效性. In order to control bridge accident at the source and improve the safety performance at the bridge operation stage,risk assessment mode,risk acceptance criteria and risk level evaluation criteria were established from the mechanism of risk.Then,taking into account the risk loss of uncertainty and ambiguity,fuzzy comprehensive evaluation method of the consequences of failure was created based on the fuzzy mathematics method and analytic hierarchy process to quantify the risk of loss and complete risk evaluation.Example shows that the method is feasible and effective.
出处 《山东理工大学学报(自然科学版)》 CAS 2015年第4期1-5,共5页 Journal of Shandong University of Technology:Natural Science Edition
基金 山东省自然科学基金资助项目(ZR2011EL010) 中央高校基本科研业务费专项资金资助项目(2013G1502017)
关键词 风险估计 层次分析法 风险损失 隶属度函数 risk estimation analytic hierarchy process risk losses membership functions
  • 相关文献

参考文献9

二级参考文献31

共引文献126

同被引文献17

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部