4ACI Committee 209. Prediction of Creep, Shrinkage and Temperature Effects in Concrete Structure (ACI 209R-92) [R]. Farmington Hills, Mich., 1992.
5Mulle HS,Hilsdorf HK. Evaluation of the Time-Dependent Behavior of Concrete[R]. CEB Bulletin d' Information, 1990.
6Bazant ZP, Baweja S. Creep and shrinkage Prediction Model for Analysis and Design of Concrete Structures-model/33 [J ]. Materials and Structures, 1995 (28) : 357-365.
7Gardner MJ,Lockman MJ.Design Provisions for Drying Shrinkage and Creep of Normal-Strength Concrete [J ]. ACI Materials Journal, 2001,98(2) : 159-167.
8Brooks JJ,Neville AM. Estimating Long-Term Creep and Shrinkage from Short-Term Tests [ J ]. Magazine of Concrete Research, 1975,27 (90) : 51-60.
9Brooks JJ,Neville AM.Prediction Long-Term Creep and Shrinkage from Short-Terra Tests [ J ]. Magazine of Concrete Research, 1978,30(103) :51-60.
10Sirivivatnanon V. Predicting Long-Term Creep from Short- Term Creep Test[ M]. ACI SP-229,49-62.