摘要 结合我国近年采用燃气轮机发电供能发展情况,分析存在的问题和不足,面对未来将重新规划开发建设首钢高新产业园区这一历史机遇,说明在首钢园区规划建设燃气冷热电三联供项目的可能性;提出工作切入点、运营三联装备应具备的条件,并通过总结我国当前建设三联供项目的制约因素,提出解决问题的意见建议。 Combining with domestic development situation of fuel gas turbine power generation and supply in recent years, the existing problems and shortcomings were analyzed.Faced with the historic opportunity of re-planning of Shougang New Hi-tech Industrial Zone,the feasibility of combined supply project of cool and thermal power at the zone was presented and the work breakthrough point and required conditions for combined power supply operation were put forward. Through summarizing the current restricting factors in constructing combined power supply projects in China, opinions and recommendation on the problem solution were provided.
作者 杨旸
出处 《冶金动力》 2016年第1期40-43,46,共5页 Metallurgical Power
关键词 燃气 冷热电三联供 能源 规划 fuel gas combined supply of cool and thermal power energy planning
  • 相关文献

同被引文献16

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部