期刊文献+

马钢铁前系统降低铁水成本的实践

Practice of Hot Metal Cost Reduction in Before-ironmaking System at MaSteel
下载PDF
导出
摘要 介绍了马钢铁前系统围绕着高炉稳定顺行的目标,实行"研、供、产"系统联动,降低进口矿库存,稳定配煤、配矿,强化管理,提高技术操作水平。2014年4月以来基本实现了大、中、小型高炉稳定均衡生产,铁水成本逐步降低。 The practice of systematic linkage of "research, supply and production", reducing the inventory of im- ported ore, stabilizing coal blending and ore blending, enhancing management and improving technical operation level with the focus on the goal of blast furnace stable operation in MaSteel's before-ironmaking system is introduced. Since April, 2014, stable balanced production of all large, medium and small blast furnaces has basically been achieved and hot metal cost gradually reduced.
出处 《安徽冶金》 2015年第4期27-30,共4页 Anhui Metallurgy
关键词 系统联动 进口矿库存 结构降本 system linkage inventory of imported ore structural cost reduction