铁路隧道软弱围岩地段斜井进主洞挑顶施工技术 被引量:2

Construction Technology of Railway Tunnel in Soft Rock Section Inclined Shaft into Main Tunnel Roof Ripping
下载PDF
导出
摘要 在长大隧道的施工过程中,为了满足工期和运营的需要,往往需要增设斜井。斜井施工完成后,需要进行挑顶,以逐步扩大到主洞的大断面施工。通往主洞施工的过渡段受力复杂,处理不好可能形成长久的安全隐患,所以斜井挑顶进主洞是施工的重点。本文结合张庄特长隧道施工情况,介绍了隧道软弱围岩斜井进主洞"外包法"施工技术,安全又快速的方式保证了斜井进入主洞施工。 In the long tunnel construction process, in order to meet the need of duration and operating, it is often needed the additional inclined shaft. After Inclined shaft completion of the construction, it needs to roof ripping so as to gradually expand to the construction of large cross main tunnel. If it is not handled properly to main tunnel transition section construction of complex stress, there will be a long-term security risk. So the construction of inclined shaft into main tunnel roof ripping is the key in the process. In this ar-ticle, combining the Zhang Zhuang long tunnel construction case, it introduced "outer" construction tech-nology of inclined shaft weak surrounding rock into main tunnel, which is a safe and quick way to ensure the construction of inclined shaft into main tunnel.
作者 姜永振
出处 《辽宁省交通高等专科学校学报》 2015年第6期12-16,共5页 Journal of Liaoning Provincial College of Communications
关键词 软弱围岩 斜井 主洞 外包法 挑顶 施工 weak surrounding rock inclined shaft main tunnel outer construction technology roof ripping construction
  • 相关文献

参考文献4

二级参考文献15

  • 1辛国平,陈宪麦.黄土地区大跨度公路隧道施工技术[J].铁道建筑,2007,47(3):41-43. 被引量:9
  • 2雷军,赵玉成.大跨度软岩公路隧道短台阶施工方法[C].国际隧道研讨会暨公路建设技术交流大会论文集:339-345.
  • 3TB 10601-2009高速铁路工程测量规范[S].
  • 4铁建设[2010] 241号,高速铁路隧道工程施工技术指南[S].
  • 5TZ214-2005客运专线铁路隧道工程施丁指南[S].
  • 6铁建设[2005]160号客运专线铁路隧道工程施工质量验收标准[S].
  • 7TB10304-2009铁路隧道工程施工安全技术规范[S].
  • 8隧道监控量测技术规程[S].北京:中国铁道出版社,2008.
  • 9关宝树.隧道施工要点集[M].北京:人民交通出版社,2003..
  • 10中华人民共和国交通部.JTGD70-2004公路隧道设计规范[S].北京:人民交通出版社,2004.

共引文献43

同被引文献13

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部