期刊文献+

基于加权平均法的岩溶隧道突涌水风险评估 被引量:16

Risk Assessment of Water Inrush in Karst Tunnels Based on Weighted Average Method
下载PDF
导出
摘要 岩溶隧道突涌水问题是岩溶地区隧道工程建设中的主要地质灾害之一。基于岩溶隧道突水灾害发生的影响因子,建立了以地层岩性、不良地质、地下水位、地形地貌、岩层产状及层面与层间裂隙等6个地质影响因子为主的评价指标体系;基于加权平均法考虑采用多因素单一综合指标评价方法,建立了隧道突涌水风险评估分析模型,以鸡公岭隧道ZK19+509~ZK19+539段为实例,对其突涌水进行风险评估,其评价结果与其他方法所得结果及工程实际情况较为吻合,验证了本方法的合理性与可行性。 Water inrush is one of the major geological hazards during tunnel construction in karst area. Based on the factors of water inrush in karst tunnel, an evaluation system is established which mainly includes geological factors such as formation lithology, unfavorable geology, groundwater level, topography and geomorphology, attitude of rocks, layer and interlayer fissures. Applying the weighted av- erage method and considering the multi-factor single comprehensive index value method, a risk assess- ment model of water inrush in tunnel construction is established to evaluate the hazards of water inrush in karst tunnel. Taking Jigongling Tunnel(ZK19 +509 ~ ZK19 +539 part) as an example, this paper as- sessed its water inrush in weighted average method and the evaluation result consistent with the actual sit- uation, which verified the rationality and feasibility of this method.
出处 《公路工程》 北大核心 2015年第6期51-54,共4页 Highway Engineering
基金 国家自然科学基金资助项目(51174124)
关键词 岩溶隧道 突涌水 风险评估 加权平均法 weighted average method karst tunnel water inrush risk assessment
  • 相关文献

参考文献8

二级参考文献86

共引文献341

同被引文献174

引证文献16

二级引证文献98

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部