期刊文献+

三峡近区电网短路电流限制措施研究 被引量:2

Research on Measures of Limiting Short-circuit Current in Power Grid near Three Gorges
下载PDF
导出
摘要 目前,三峡近区部分站点的短路电流已经超过其断路器的遮断容量,成为制约三峡近区电网进一步发展的关键因素。在回顾三峡输电系统构建过程中短路电流优化方案的基础上,结合三峡近区电网的结构特点、三峡机组间的小干扰稳定特性,提出了加装串联电抗器、背靠背联网、特高压分母、优化电网结构、调整运行方式5类短路电流限制措施,并研究了各类措施的限流效果和实用性,推荐了不同网架方案下三峡近区电网的短路电流解决方案。 Short-circuit current exceeding the allowable capacity of breakers is a critical constraint for developing the power grid near Three Gorges.Combining the structure features of the grid near Three Gorges and the small signal stability of generators,the paper proposes the measures for limiting the short circuit current,including series reactor installing,back to back HVDC connection,UHV bus segmented,optimizing the grid structure and adjusting the operating mode,discusses the effect and practicability of the limiting measures,and recommends the solution for limiting the short circuit current under different power grid structure near Three Gorges.
出处 《陕西电力》 2015年第12期48-51,79,共5页 Shanxi Electric Power
基金 国家电网公司科技项目资助(SGTYHT/13-JS-175)
关键词 三峡近区电网 短路电流 小干扰稳定 特高压分母 运行方式 power grid near Three Gorges short-circuit current small signal stability UHV bus segmented operation mode
  • 相关文献

参考文献16

二级参考文献61

共引文献409

同被引文献26

引证文献2

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部