期刊文献+

高频GPS数据地震应急处理方法研究 被引量:1

High-frequency GPS Data Processing for Earthquake Emergency
下载PDF
导出
摘要 对于GPS动态定位模式,高频(≥1Hz)GPS数据需要30s或者更高采样率的卫星钟差,而满足需要的IGS星历产品至少要延迟12~18d才能获得。显然,常规的GPS数据处理方法无法满足地震应急的需要。本文提出一种针对地震应急高频GPS数据处理方法,利用陆态网络GPS高频数据解算获得中国大陆区域高精度卫星钟差,进而解算获得测站地表瞬时形变位移,突破常规处理方法的限制,可在地震发生后仅数小时获得快速、准确、可靠的结果。这种方法在2013年芦山MS7.0级地震得到了实际应用。 In GPS Kinematic Positioning mode, High frequency (≥1 Hz) GPS data pro cessing needs satellite clock error of sampling intervals of 30 s or higher rate. However, IGS ephemeris products that meet the needs will delay 12-18 d. Obviously, conventional GPS data processing can not meet earthquake emergency needs. A new processing method of high-frequency GPS data for earthquake emergency is put forward in this paper. The displacements of surface deformation can be obtained within several hours after earthquake occurrence. And this method was demonstrated in GPS data processing following the 2013 Ms 7.0 Lushan Earthquake.
出处 《地震》 CSCD 北大核心 2016年第1期133-140,共8页 Earthquake
基金 中国地震局地震预测研究所基本科研业务专项(2013IES0201)资助
关键词 GPS PPP动态定位 地震应急 地表瞬时形变位移 2013年芦山Ms7.0级地震 GPS data processing Kinematic Positioning Earthquake Emergency The 2013 Ms7.0 Lushan Earthquake
  • 相关文献

参考文献16

  • 1LarsonK M. GPSseismology[J]. Journal of Geodesy, 2009, 83(3): 227-233.
  • 2Blewitt G, Heflin M B, Hurst K J, et al. Absolute far-field displacements from the 28 June 1992 Landers earthquake sequence[-J]. Natrue, 1993, 361(6410): 340-342.
  • 3Gordon L E, Jennifer S H, Kyuhong C, et al. Recovering Seismic Displacements through Combined Use of 1-Hz GPS and Strong-Motion Accelerometers[J]. Bull Seism Soc Am, 2007, 97(2): 357- 378.
  • 4Larson K M, Bodin P, Gomberg J. Using 1-Hz GPS data to measure deformations caused by the Denali fault 120 earthquake[J]. Science, 2003, 300(5 624) : 1421-1424.
  • 5Crowell B W, Bock Y, Melgar D. Real-time inversion of GPS data for finite fault modeling and rapid hazardassessment[J]. GeophyslResLett, 2012, 39(9): L9305.
  • 6Ohta Y, Kobayashi T, Tsushima H, et al. Quasi real-time fault model estimation for near-field tsu- nami forecasting based on RTK-GPS analysis: Application to the 2011 Tohoku-Oki earthquake (Mwg. 0)[J]. J. Geophys. Res., 2012, 117(B2): B2311.
  • 7GS(International GNSS Service). http ://igsws. unavco, org/components/prods, htmL.
  • 8陈克杰.“陆态网络”基准站GNSS数据在地壳运动监测中的应用研究[D].武汉:武汉大学硕士学位论文,2012.
  • 9楼益栋,施闯,周小青,叶世榕.GPS精密卫星钟差估计与分析[J].武汉大学学报(信息科学版),2009,34(1):88-91. 被引量:78
  • 10蔡华,赵齐乐,楼益栋.精密卫星钟差确定系统的实现与精度分析[J].武汉大学学报(信息科学版),2009,34(11):1293-1296. 被引量:19

二级参考文献47

共引文献337

同被引文献11

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部