根据工程实际情况,充分发挥工程结构自身承载的作用,采用双立杆、分段卸荷、加强稳定性构造措施等方法进行超高模板支撑体系的设计,提出过程控制要点和做法。
According to the engineering actual situation,give full play to the role of the project itself bearing structure,adopts double stud,unloading,strengthen the stability measures method for the design of high formwork support system,process control points and methods are put forward.