期刊文献+

小浪底枢纽进水塔前允许淤沙高程值研究

Experimental research on allowable silt elevation values before intake tower in the Xiaolangdi hub
下载PDF
导出
摘要 小浪底枢纽进水塔前泥沙淤堵会影响工程效益发挥,甚至影响枢纽安全运行,当塔前淤沙高程超过允许淤沙高程值时,打开泄水孔洞,会出现孔洞不出流或短时间不出流的现象。采用正态动床模型试验,通过对不同淤沙高程值方案进行研究,分析不同方案达到淤积高程的时间,达到淤积高程开启底孔后出流情况、淤堵时间,得出小浪底水利枢纽运用后期,泄水建筑物底孔前允许淤沙高程值仍可采用187.0m的结论。 The silt clogging before the intake tower in Xiaolangdi could affect the effectiveness and even affect the safe operation of the huh. When the silt exceeded the allowable height of the elevation values, no flow or no flow in short time could occur with the drainage hole opened. In this paper, we use the model test of normal muddy water mobile bed. Basing on the different research programs of the elevation values, we analyzed the time when the silt achieve the siltation elevation and the stream of the bottom outlet when the silt achieve the allowable height and the clogging time by each program. It could be concluded that the discharge structure's allowable elevation values of Xiaolangdi could be determined as 187m in the later stage.
出处 《黑龙江水利》 2015年第11期5-10,共6页
基金 国家自然科学基金(51579103)
关键词 小浪底 泥沙淤堵 泄水孔洞 允许淤沙高程 正态模型 Xiaolangdi silt clogging drainage holes allowing silt elevation normal model
  • 相关文献

参考文献6

  • 1黄河勘测规划设计有限公司.小浪底水利枢纽进水塔群前防淤堵研究报告[R].郑州:黄河勘测规划设计有限公司,2015.
  • 2张俊华,王严平,尚爱亲,张柏山.挟沙水流指数流速分布规律[J].泥沙研究,1998,23(4):73-78. 被引量:11
  • 3孙东坡,郭选英,张羽,等.小浪底水利枢纽进水塔群前防淤堵动床浑水实体模型研发试验报告[R].郑州:华北水利水电大学,2015.
  • 4窦国仁,王国兵,王向明,于为信,高亚军,韩信.黄河小浪底工程泥沙问题的研究[J].水利水运科学研究,1995(3):197-209. 被引量:6
  • 5曾庆华,周文浩,陈建国,赵华侠.黄河小浪底枢纽泥沙问题的试验研究[J].水利学报,1995,27(8):53-59. 被引量:3
  • 6王庆明,安催花,林秀山,等.小浪底水利枢纽拦沙后期(第一阶段)运用调度规程[R].郑州:黄河勘测规划设计有限公司,2009.

二级参考文献5

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部