摘要
利用有限元程序SAP2000并考虑材料、边界条件和荷载作用的时变性与桩基础沉降等影响因素,以单元生死法精确模拟了施工过程,对某超高层钢管混凝土(CFST)框筒结构在施工阶段的竖向变形差异、构件内力分布变化规律和施工方案的优化进行了研究。分析了不同工况和施工方案对CFST框筒混合结构的内力和变形的影响,得到了最优的施工方案,并根据竖向变形的分析结果,对竖向承载构件的施工标高进行了预调值计算分析。
By considering the time-dependent property of materials and boundary conditions and load and settlement of pile foundation, using the finite element program SAP2000 and element birth and death method precisely simulates the process of construction, the different vertical deformation of concrete filled steel tube and RC core wall and the internal force change of the members during the construction stage are researched. By comparing different conditions and construction schemes of concrete filled steel tube and core wall hybrid structure which have various influence on the deformation and distribution of internal force, the optimized construction scheme is selected, and based on the results of vertical deformation the pre-deformation of vertical members are calculated.
出处
《施工技术》
CAS
北大核心
2016年第2期53-57,共5页
Construction Technology
关键词
高层建筑
钢管混凝土
框筒结构
施工模拟
方案优化
预调值
tall buildings
concrete filled steel tube(CFST)
frame tube structure
simulation
scheme optimization
pre-deformation