上楼面大型行走式塔式起重机在钢结构施工中的应用 被引量:3

Application of Large-scale Walking Tower Crane on the Floor in Steel Construction
下载PDF
导出
摘要 某大剧院主要由5个场馆组成,5个场馆均位于大面积混凝土结构楼层上,在混凝土结构外侧使用大型起重机无法完全覆盖吊装范围,利用混凝土结构楼层的受力特点,在首层混凝土结构楼面上布置4台1 400t·m大型行走式塔式起重机以满足所有构件的吊装要求。通过合理的设计计算分析,在混凝土柱顶设置钢短柱、在柱距较大位置设置临时钢柱,在上部铺设轨道梁,将塔式起重机荷载传递到混凝土柱和临时钢柱上。该施工技术具有经济适用、安全可靠的优点。 A theatre is constituted by five venues which are above the floor in the large area of concrete structure. The large-scale crane can't cover all hoisting range in the lateral concrete structure, so two 1 400t.m walking tower cranes, which are set on the first layer floor of concrete structure, are set to satisfy all the hoisting members. With analysis and calculation of reasonable design, the hoisting load of crane is transferred to the concrete column and temporary steel column through the track bearing beam by setting short steel eolunm on the concrete column, and temporary steel column in the long concrete column distance. This construction technology has advantage of economy, applieability, safety and reliability.
作者 朱平
出处 《施工技术》 CAS 北大核心 2016年第2期82-84,共3页 Construction Technology
关键词 钢结构 塔式起重机 楼面作业 轨道梁 吊装 steel structures tower cranes walking on floor track beam hoists
  • 相关文献

参考文献5

二级参考文献13

  • 1GB50026-2007工程测量规范[S].
  • 2GB50017-2003.钢结构设计规范[S].[S].,..
  • 3GB50205-2001.钢结构工程施工质量验收规范[S].[S].,..
  • 4徐有邻,冯大彬.推广现浇空心楼盖发展节约型混凝土结构[C]//全国现浇混凝土空心楼盖结构技术交流会论文集.上海:2005:1-7
  • 5程志军,王晓锋.《现浇混凝土空心楼盖结构技术规程》CECSl75:2004简介[C]//全国现浇混凝土空心楼盖结构技术交流会论文集.上海.2005.
  • 6中国建筑科学研究院.CECSl75:2004现浇混凝土空心楼盖结构技术规程[S].2004.
  • 7中国建筑科学研究院.建筑结构荷载规范[M]中国建筑工业出版社,2005.
  • 8陈禄如等主编,中国钢结构协会.建筑钢结构施工手册[M]中国计划出版社,2002.
  • 9张琨,陈振明.CCTV主楼大型塔吊应用阶段的结构分析及加固技术[J].施工技术,2008,37(7):97-99. 被引量:8
  • 10范鹏涛,高良,曹美娣.楼面行走式塔吊施工加固计算[J].建筑结构,2010,40(S1):357-360. 被引量:2

共引文献8

同被引文献15

  • 1陈友明,王恒,高干行走式塔式起重机吊装大跨度钢屋盖技术[J].钢结构与建筑业,2009(11):172-175.
  • 2中建钢构有限公司.一种材料运输桁车:中阂.201520287305.5[P].2015-05-06.
  • 3Structural use of steelwork in buildings-part 1 : code of practice for design-rolled and wehted sections: BS 5950-1 : 2000 [ S ]. 2000.
  • 4Structural use of steelwork in buildings-part 2: specification for materials, fabrication and erection-rolled and welded seetions:BS 5950-2:2001 [ S]. 2001.
  • 5Structural use of concrete: BSS110-1:1997 [ S]. 1997.
  • 6Euro code 3-design of steel structures-part 6: crane supporting structures : BSEN 1993-6:2007 [ S ]. 2007.
  • 7Rules for design of cranes: BS2573-1 [ S ].
  • 8金俞槐,雷青,李赞恩.南京紫峰大厦钢结构工程安装工艺研究[J].建筑机械化,2009,30(10):66-70. 被引量:2
  • 9杨圣邦,尹昌洪,周明,李小进,陈利衡.大跨距、弯弧式塔吊轨道的设计[J].空间结构,2015,21(3):63-70. 被引量:1
  • 10王东,王忠,郑健,王大勇.核心筒爬模施工过程中井筒内钢梁安装技术[J].施工技术,2015,44(23):94-97. 被引量:4

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部