稳定索在钢拱塔竖转施工过程控制中的应用分析 被引量:5

Application and Analysis of Stable Cable in the Construction Process Control of Steel Arch Tower Rotation
原文传递
导出
摘要 针对斜拉桥钢拱塔竖转施工过程中出现的拱脚位移和应力过大问题,以武汉高新二路独塔斜拉桥为研究背景,提出了一种斜拉桥钢拱塔竖向转体变形控制装置——稳定索,并通过有限元分析软件ANSYS分别对稳定索的安放位置、稳定索拉力大小的选取及稳定索释放对钢拱塔稳定性的影响进行了计算分析,最后通过监测数据进一步验证了该变形控制装置的技术合理性。 Based on the single tower cable-stayed bridge on the Gaoxin 2nd Road in Wuhan, a deformation control device is proposed to solve the problem of displacement and stress of arch springing in the vertical rotation construction of the tower of cable-stayed bridge. The location and cable force and the impact to the tower stability from the release of stable cable are computed and analyzed by the FEM software ANSYS. Finally, the technical rationality of the stable cable is verified by monitoring data.
出处 《公路》 北大核心 2016年第1期90-94,共5页 Highway
关键词 斜拉桥 竖转施工 过程控制 稳定索 有限元分析 cable-stayed bridge vertical rotation construction process control stable cable FEM analysis
  • 相关文献

参考文献9

二级参考文献24

  • 1张洪涛,朱晓钢,王海波,李树勋.SUS304不锈钢中厚板埋弧焊[J].石油化工设备,2004,33(4):54-56. 被引量:2
  • 2闫冬,袁万城.大跨度斜拉桥的抗震概念设计[J].同济大学学报(自然科学版),2004,32(10):1344-1348. 被引量:23
  • 3高兴泽,范大意,杨仁康.景德镇白鹭大桥钢塔竖向转体施工技术[J].铁道工程学报,2007,24(5):55-62. 被引量:18
  • 4周广伟,黄龙华.桥梁转体施工技术[J].华东公路,2007(3):8-10. 被引量:20
  • 5工程类标准.重型结构(设备)整体提升技术规程.DG/TJ08-2056-2009.J11400-2009.
  • 6Fleming J F,Egeseli E A. Dynamic Behavior of a Cable-Stayed Bridge[J]. Earthquake Engineering & Structural Dynamics,1982, 8:1-16.
  • 7Nazmy A S, Abedel-Chaffar A M. Non-linear Earthquake Response Analysis of Long-Span Cable-Stayed Bridges:Theory[J]. Earthquake Engineering & Structural Dynamics, 1990,19:45-62.
  • 8童智洋 侍刚.沈阳市公和斜拉桥检测评估报告[R].武汉:中铁大桥局集团武汉桥梁科学研究院有限公司,2004..
  • 9王新敏.ANSYS工程结构数值分析[M].北京:人民交通出版社,2012.
  • 10中华人民共和国电力工业部.水工建筑物荷载设计规范[S].北京:中国电力出版社,1998.

共引文献67

同被引文献50

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部