3COLOMIA,DORIGOM,MAN IEZZO V,et al.Ant system for job-shop scheduling[J].Belgian Journal of Operations Statistics and Computer Science,1994,34(1):39-53.
5Daisy X M,Zheng S,Thomas N G,Mohan M.Kumaraswamy.Applying a genetic algorithm-based multiobjective approach for time-cost optimization[J].Journal of Construction Engineering and Management,2004,130(2):168-176.
6Feng C W,Liu L,Burns S A.Using genetic algorithms to solve construction time-cost trade-off problems[J].Journal of Computing in Civil Engineering,1997,11(3):184-189.
7Dorigo M,Gambardella L M.Ant colonies for travelling salesman problem[J].BioSystems,1997,43:73-81.
8Zheng D,Ng S T,Kumaraswamy M.Applying a genetic algorithm-based multiobjective approach for time-cost optimization[J].Journal of Construction Engineering and Management,2004,130(2):168-176.
9Zadeh L A.Fuzzy sets[J].Inf Control,1965,8:338-353.