期刊文献+

基于拉格朗日松弛的手术中心调度算法 被引量:10

Lagrangian relaxation-based scheduling algorithm for operating theatres
原文传递
导出
摘要 为了有效提高手术中心的利用率,降低医院的成本,提高病人满意度,本文提出了基于拉格朗日松弛的手术中心调度算法.首先对问题域进行了描述,以最小化手术中心相关成本和最大化病人满意度为目标,建立数学规划模型.在此基础上,建立可行调度解策略,结合手术中心特有的约束条件,提出基于拉格朗日松弛的手术中心调度方法,并用分枝定界求解子问题.最后,设计不同问题规模的实验,对算法性能进行了评价和对比分析,实验表明,该算法能在可接受的计算时间内得到较好的近优解. To improve the efficiency of operating theatre effectively, reduce the hospital's costs and improve the satisfaction of patients, an operating theatre scheduling method was presented based on a Lagrangian relaxation (LR) algorithm. Firstly, a problem domain was described. Mathematical programming models were also set up with objective functions of minimizing related costs of the operating theatre and maximizing the satisfaction of patients. On the basis of the descriptions mentioned above, a solving policy of generating feasible scheduling solutions was established. Combining with the specific constraints of operating theatre, the LR-based algorithm was put forward to solve scheduling problems, and the sub-problems were solved via a branch and bound algorithm. Finally, computational experiments were performed on different scale of problems. The performance of the proposed algorithm was evaluated and compared with that of other approaches. Results demonstrated that the proposed method can obtain better near-optimal solutions in acceptable computation time.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2016年第1期224-233,共10页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(71471135 61273035)~~
关键词 手术中心调度 多目标优化 拉格朗日松弛算法 分枝定界 operating theatre scheduling multi-objective optimization Lagrangian relaxation algorithm branch and bound
  • 相关文献

参考文献15

  • 1Su M C, Lai S C, Wang P C, et al. A SOMO-based approach to the operating room scheduling problem[J]. Expert Systems with Applications, 2011, 38(12): 15447-15454.
  • 2邓富民,梁学栋,刘爱军,包北方.多资源约束下改进NSGA-Ⅱ算法的手术调度[J].系统工程理论与实践,2012,32(6):1337-1345. 被引量:41
  • 3Vijayakumar B, Parikh P J, Scott R, et al. A dual bin-packing approach to scheduling surgical cases at a publicly-funded hospital[J]. European Journal of Operational Research, 2013, 224(3): 583-591.
  • 4Devi S P, Rao K S, Sangeetha S S. Prediction of surgery times and scheduling of operation theaters in ophthal- mology department[J]. Journal of Medical Systems, 2012, 36(1): 415-430.
  • 5Lamiri M, Augusto V, Xie X L. Patients scheduling in a hospital operating theatre[C]// IEEE International Conference on Automation Science and Engineering. IEEE, 2008: 627-632.
  • 6Huang G X, Xiang W, Li C, et al. Surgical scheduling based on hybrid flow-shop scheduling[C]//3rd International Conference on Engineering Design and Optimization. Trans Tech Publications Ltd, 2012: 1004-1007.
  • 7Augusto V, Xie X L, Perdomo V. Operating theatre scheduling using Lagrangian relaxation[J]. European Journal of Industrial Engineering, 2008, 2(2): 172-189.
  • 8Augusto V, Xie X L, Perdomo V. Operating theatre scheduling with patient recovery in both operating rooms and recovery beds[J]. Computers ~ Industrial Engineering, 2010, 58(2): 231-238.
  • 9轩华,唐立新.实时无等待HFS调度的一种拉格朗日松弛算法[J].控制与决策,2006,21(4):376-380. 被引量:25
  • 10朱宝琳,于海斌,黄小原,史海波.基于拉格朗日松弛的供应链合作生产计划模型研究[J].控制与决策,2009,24(12):1791-1794. 被引量:5

二级参考文献31

  • 1朱宝琳,于海斌,黄小原.供应链计划建模中的博弈方法[J].东北大学学报(自然科学版),2004,25(7):703-706. 被引量:4
  • 2Fransoo J C, Wouters M J F. Multi-echelon multicompany inventory planning with limited information exchange[J]. J of the Operational Research Society, 2001, 52(6): 830-838.
  • 3Ozdamar L, Yazgac T. A hierarchical planning approach for a production-distribution system [J]. Int J of Production Research, 1999, 37(16): 3759-3772.
  • 4Simpson, Simpson N C, Erenguc S Selcuk, et al. Modeling the order picking function in supply chain system: Formulation experiment and insights[J]. IIE Trans, 2001, 33(2): 119-130.
  • 5Kilger C, Reuter B. Collaborative planning, supply chain management and advanced planning[J]. 2002, 33 (2): 223-237.
  • 6Gregor Dudek, Hartmut Stadtler. Negotiation-based collaborative planning between supply chains partners[J]. European J of Operational Research, 2005, 163 (3) : 668-687.
  • 7Lamiri M, Xie X L, Dolgui A, et al. A stochastic model for operating room planning with elective and emergency demand for surgery[J]. European Journal of Operational Research, 2008, 185:1026 1037.
  • 8Blake J T, Dexter F, Donald J. Operating room managers' use of integer programming for assigning block time to surgical groups: A case study[J]. Anesth Analg, 2002, 94(1): 143-148.
  • 9Jebalia A, Hadj Alouane A B, Ladeta P. Operating rooms scheduling[J]. Int J Production Economics, 2006, 99: 52 62.
  • 10Cardoena B, Demeulemeestera F, Beliena J. Sequencing surgical cases in a day-care environment: An exact branch-and-price approach[J]. Computers gg Operations Research, 2009, 36:2660 2669.

共引文献68

同被引文献88

引证文献10

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部