期刊文献+

固海扬黄扩灌工程十一泵站建后灌区节水改造 被引量:1

Water-saving reform technology is started in irrigation district after Eleven Pump Station of Yanghuang Irrigation Project was built in Guhai
下载PDF
导出
摘要 宁夏回族自治区在固海扬黄扩灌工程十一泵站建设以后,由于灌区最初的低压管灌节水灌溉不成功,需要进行节水改造。通过选择试验区进行滴灌和喷灌技术实验研究,提出节水改造推广以滴灌为主、喷灌辅之,通过将土地流转变为公司化的机械化耕作、生产、销售于一体的集约化经营管理模式,实现灌区良性运行持久发挥效益。 The work of water-saving reform is started in irrigation districts of Ningxia, because the water-saving effect of low pressure pipeline irrigation is not good after Eleven Pump Station of Yanghuang Irrigation Project was built in Guhai. By experimental investigation, some suggestions are put forward. Water-saving reform technology is given priority with drip irrigation, sprinkler irrigation is complementary. Intensive management mode is implemented to realize mechanized farming, production and sales. Finally, irrigation districts will be very well and bring benefits.
作者 杨长林
出处 《中国水利》 2016年第1期42-44,47,共4页 China Water Resources
关键词 节水改造 滴灌和喷灌 管理模式 扬黄灌区 water-saving reform drip irrigation and spray irrigation management mode Yanghuang Irrigation District
  • 相关文献

参考文献3

二级参考文献10

共引文献11

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部