期刊文献+

高海拔区域工程控制网的建立与分析——以青海某选煤厂工程为例

Establishment and Analysis of Engineering Control Network in High Altitude Area——Take a Coal Separating Plant Project in Qinghai as an Example
下载PDF
导出
摘要 通过青藏高原某工程项目实例,分析了坐标系的选择及控制测量的成果精度,通过控制点检核,选择可靠的控制点参与平差才能保证成果精度,介绍了在高原地区使用全站仪的注意要点,总结了高原地区应予关注的问题。 Through a project of the Tibetan plateau , this artical analysed the choice of coordinate system and the accuracy of eontral surveying results. Through the inspection of the control points, choose reliable control points in the adjustment in order to ensure the precision of the achievements, introduced the points for attention in the use of total station and summarized problems should be concern in plateau area.
出处 《北京测绘》 2015年第6期122-125,共4页 Beijing Surveying and Mapping
关键词 投影变形 GPS 全站仪 大气常数 distortion of projection GPS total station independent coordinate system atmospheric constant
  • 相关文献

参考文献3

  • 1中华人民共和国建设部.GB 50026-2007工程测量规范[S].北京:中国计划出版社,2012.
  • 2国家质量监督检验检疫总局.GB/T18314-2009全球定位系统(GPS)测量规范[S].北京:中国标准出版社,2009.
  • 3(株)拓普康北京事务所.拓普康GPT-3100N系列脉冲全站仪使用手册[Z].北京,(株)拓普康北京事务所,2009.

共引文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部