期刊文献+

鞍山某矿区综合尾矿预选的初步探讨

Preliminary Discussion on Pre-concentration of Comprehensive Tailings in a Mine in Anshan
下载PDF
导出
摘要 通过对鞍山某矿区综合尾矿性质的分析和必要的实验室试验,确定合理的选别工艺,得出较理想工艺指标。试验结果表明,采用"螺旋溜槽-扫永磁选别试验"对鞍山某矿区综合尾矿进行预选,要获得较高品位的最终精矿,必须对粗精矿细磨,才能实现铁矿物的充分解离。 By analyzing the characteristics of comprehensive railings in a mine in Anshan and conducting necessary laboratory tests on these railings, reasonable separation process is determined and desirable process indexes are obtained. The testing results show that when process "spiral chute--scavenging with permanent magnetic separator" is adopted for the pre-concentration of tailings in the mine, in order to obtain a high grade concentrates, coarse concentrates must be ground so that the iron concentrates can be fully separated.
出处 《矿业工程》 CAS 2015年第6期15-17,共3页 Mining Engineering
关键词 铁矿 综合尾矿 选矿 iron ore comprehensive tailings beneficiation
  • 相关文献

参考文献3

  • 1黄晓燕,余永富.铁选矿评述[A].第九届全国选矿年会学术会议论文集[c].厦门:中国有色金属学会,2001.
  • 2程希翱.近代选矿工艺矿物学发展动向[A].当代中国选矿技术学术研讨会论文集[c].攀枝花:中国金属学会,1993.
  • 3鲁荣林.东鞍山铁矿矿石工艺矿物学特征研究[J].金属矿山,2004,33(9):40-41. 被引量:25

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部