地铁暗挖法施工中降水引起地面沉降问题的探讨 被引量:2

Discussion on the Ground Subsidence Caused by Precipitation during Subway Excavation Construction
下载PDF
导出
摘要 近年来,地铁暗挖施工中辅助降水措施取得了很大成功,但由降水引起的地面沉降,其成因、危害性、如何避免和控制是十分重要的问题。本文结合北京地铁7号线双井站工程实际经验,对降水沉降问题进行探讨和总结。车站主体暗挖施工过程中,监测降水沉降值仅4.0mm,证明双井站降水方案和沉降控制措施是合理的。 In recent years, the assistant precipitation measures during the subway construction has achieved great success. However, the ground subsidence caused by precipitation, and how to avoid and control is a very important problem. In this paper, combined with the engineering practical experience of the Beijing Shuangjing Station on Line 7, the problems of dewatering and settlement are discussed and summarized. During the station excavation construction process, the precipitation sedimentation value is monitored to be only 4.0mm. This dewatering scheme has been proved effectively in Shuangjing Station settlement control measures.
出处 《城市地质》 2015年第B12期12-16,共5页 Urban Geology
关键词 降水 固结沉降 沉降控制 Precipitation The consolidation settlement Settlement control
  • 相关文献

参考文献2

二级参考文献3

共引文献32

同被引文献15

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部