摘要
分析了当前厂用电考核管理中存在的问题,提出了用直接厂用电率代替综合厂用电率考核电厂厂用电水平。采用经粒子群算法改进的最小二乘法,克服了常规方法拟合误差大的缺点,大幅提高了计算精度,有效地应用于某个西南地区的常规水电站用电量的考核中,取得了良好效果,表明了算法的有效性。
With an analysis on existing problems in the assessment management of the station service power consumption in hydropower stations, a suggestion is given to replace the current assessment criterion based on the comprehensive pow- er consumption rate by the direct power consumption rate. Then, a calculation model of the direct station service power consumption rate based on the least square method and the particle swarm algorithm is proposed. The improved calcula- tion model is of higher accuracy than traditional methods. The effectiveness of the proposed model is demonstrated by a practical application example in a conventional hydropower station in Southwest China.
出处
《水电与新能源》
2016年第1期28-31,37,共5页
Hydropower and New Energy
关键词
厂用电管理
直接厂用电
粒子群算法
最小二乘法
station service power management
direct station service power consumption
particle swarm optimizationalgorithm
least square method