期刊文献+

工程量清单计价法在招投标工作中的优劣分析 被引量:1

Advantages and disadvantages analysis on pricing method of bill of quantities applied to bidding work
原文传递
导出
摘要 随着我国改革开放的不断发展,我国在建设工程的计价方法上不断面临新的挑战——大量运用其他计价模式的国外建筑企业进入了我国市场,与我国原本运用的定额计价法的企业展开了市场竞争,迫使我国企业遵循关于工程造价计算的国际管理,开始运用工程量清单计价法。本文通过对工程量清单计价方法应用在招投标中的优劣势进行了分析,并提出了不适于应用此计价法的招投标项目类别。 With the continued development of China reform and opening-up,a pricing method of the construction project in China is continuously faced a new challenge and that many overseas construction enterprises with other pricing modes are in China market.The overseas enterprises are conducting the market competition with Chinese enterprises with the previous applied quota pricing method.Thus China enterprises had to comply with the international management on the project pricing calculation and began to apply the engineering bill pricing method.The paper had an analysis on the advantages and disadvantages of the engineering bill pricing method applied to the bidding and pointed out that the items of the bidding project could not be applied with the pricing method.
作者 邢梓歆
出处 《煤炭经济研究》 2015年第12期76-78,共3页 Coal Economic Research
关键词 工程量清单计价法 优势 劣势 影响 engineering bill pricing method advantages disadvantages influences
  • 相关文献

二级参考文献4

  • 1GB50500-2013,建设工程工程量清单计价规范[S].
  • 2中国住房和城乡建设部;中国国家质量监督检验检疫局.建设工程工程量清单计价规范[S]北京:中国计划出版社,2013.
  • 3规范编制组.2013建设工程计价计量规范辅导,(z)[M]北京:中国计划出版社,2013.
  • 4赵益,韩飞.建设工程造价管理与控制[J].山西建筑,2011,37(4):231-232. 被引量:15

共引文献1

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部