基于前景理论的地铁施工灾后重建方案决策研究 被引量:3

Research on decision-making of post- disaster reconstruction scheme for subway construction based on prospect theory
下载PDF
导出
摘要 为解决地铁施工灾后有限重建方案的多属性决策问题,以技术先进性、工程造价、工期、对周围居民的生活的影响及环境保护措施可靠性作为决策属性指标,采用考虑决策者参照依赖、损失规避和敏感性递减等心理行为特征的多属性决策分析方法—前景理论,以综合前景值的大小作为评价指标,进行重建方案的选择,计算结果与工程实际较吻合。该研究方法可用于灾后重建方案的决策问题,为决策者提供了理论参考和决策依据。 To solve the problem of multiple attribute decision- making for limited postdisaster reconstruction program of subway construction,taking the technical advancement,engineering cost,time limit,impact on the life of surrounding residents and reliability of environmental protection measure as the decision attribute indexes,using the prospect theory as an analysis method of multiple attribute decision- making considering the psychological behavior characteristics of decision maker such as reference dependence,loss aversion and sensitivity decline,the selection of reconstruction scheme was conducted by taking the comprehensive prospect value as the evaluation index,and the calculation result was in good agreement with the engineering practice. The method can be used in the decision making of post- disaster reconstruction scheme,and it provides a theoretical reference and decision- making basis for the decision maker.
出处 《中国安全生产科学技术》 CAS CSCD 北大核心 2016年第1期143-147,共5页 Journal of Safety Science and Technology
基金 国家自然科学基金项目(71173152)
关键词 地铁施工灾害 重建方案 多属性决策 前景理论 心理行为 subway construction disaster reconstruction scheme multiple attribute decision-making prospect theory psychological behavior
  • 相关文献

参考文献19

  • 1Simon H A. Administrative behavior [ M ]. 1957 , Glencoe: FreePress.
  • 2Kahneman D , Tversky A. Prospect theory : An analysis of decisionunder risk[ J]. Econometrica, 1979 ,47 (2) :263-292.
  • 3Choi H. H.,Construction Cho H. N. and Seo J. W. Risk AssessmentMethodology for Projects [ J ] . Journal of Construction Engineeringand Underground Management,2004 ,130(2) :258-272.
  • 4Sid Ghosh , Jakkapan Jintanapakanont. Identifying and Assessing theCritical Risk Factors in an Underground Rail Project in Thailand : aFactor Analysis ApproachIntemational[ J ]. Journal of Project Man-agement ,2004 ,22(8) :633-643.
  • 5钟威,陈建平,孙金山.武汉地铁2号线矿山法施工区间隧道风险分析及其控制[J].安全与环境工程,2012,19(1):103-107. 被引量:11
  • 6徐玖平,卢毅.地震灾后重建系统工程的综合集成模式[J].系统工程理论与实践,2008,28(7):1-16. 被引量:45
  • 7宋敏.灾后重建中规划进程体系研究[J].合肥工业大学学报(自然科学版),2012,35(3):376-380. 被引量:1
  • 8杨月巧,迟宝明,胡俊锋,宴金旭.地震灾后恢复重建的后评价框架体系研究[J].灾害学,2014,29(1):18-24. 被引量:14
  • 9Wang Yingming, Yang Jianbo, Xu Dongling. A preference aggrega-tion methond through the estimation of untility intervals [ J ]. Com-puters & Operations Research,2005 ,32(8) :2027-2049.
  • 10Wang J G , Zionts S. The aspiration level interactive method( AIM)reconsidered : Robustness of solutions [ J ]. European Journal of Op-erational Research , 2006 ,175 ( 2 ) : 948-958.

二级参考文献132

共引文献185

同被引文献34

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部