摘要
结合项目施工经验,介绍D800mm预应力管桩在越南沿海三期燃煤电站项目中的施工步骤及质量控制要点,特别是施工中遇到的难点及应对措施。
Combined with construction experience, introduce the procedure and quality control points of D800 mm prestressed tubular pile construction for Vietnam Duyen Hai 3 Coal-fired Power Plant Project, especially construction difficulties and countermeasures.
出处
《工程建设与设计》
2016年第2期68-71,共4页
Construction & Design for Engineering
关键词
D800预应力管桩
施工步骤
质量控制要点
施工中难点及应对措施
D800 prestressed tubular piles
construction procedure
quality control points
the difficulties and countermeasures in construction