期刊文献+

吉图珲铁路第二松花江特大桥水中墩承台施工技术 被引量:1

Construction Technique of the Bearing Platform above Water for the 2nd Songhua River Grand Bridge on the Jituhun Railway
下载PDF
导出
摘要 吉图珲铁路第二松花江特大桥主桥采用(55.75+96+96+55.75)m预应力混凝土连续箱梁,桥址处覆盖层浅、透水且富含大直径漂石,承台入弱风化岩层1.1~2.7m,岩面倾斜,受桥位处航道水深限制和下游既有长图铁路老桥的影响,承台不能提高,也不能进行水下爆破。通过方案比选,最终确定了静压植桩机插打钢板桩围堰施工方案。实践表明,该施工方案较好地克服了各种不利因素的影响,在汛期来临前顺利地完成了水中墩承台施工。 The 2nd Songhua river grand bridge on the Jituhun Railway, whose main bridge is(55.75+96+96+55.75)m pre-stressed concrete continuous box beam, is located on the shallow pervious coverage with big boulders. Its bearing platform is under the sloping moderate weathered rock formation for 1.1m-2.7m. Because of the channel depth and the old Changtu railway bridge on the downstream, the bearing platform can not be lifted or underwater blasted. After the scheme comparison, the construction scheme of inserting steel sheet pile cofferdam by static pressure pile driver is determined. It is proved to have conquered various disadvantages and successfully finished the construction of the bearing platform above water before flood season.
作者 杨先权
出处 《工程建设与设计》 2016年第2期154-156,共3页 Construction & Design for Engineering
关键词 水中承台 入岩 施工技术 bearing platform above water rock injection construction technique
  • 相关文献

参考文献3

二级参考文献22

共引文献132

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部