期刊文献+

工程项目团队授权赋能动态调控问题研究

Research on Dynamic Control of Construction Project Team Empowerment
下载PDF
导出
摘要 结合工程项目团队授权赋能动态研究,通过分析工程项目施工不同阶段的工作属性、资源获取条件的变化,提出对项目团队授权赋能动态调控的客观需求。然后将团队发展划分为五个阶段即:形成期、震荡期、执行期、高效期、解散期,通过分析不同阶段中能力、团队沟通与团队文化三方面的变化,说明团队逐渐成熟,为团队授权赋能动态性调控提供实施条件。 Combined with dynamic empowerment research of construction project team,the paper first divides construction process into four stage:construction preparation stage,working surface opening stage,working surface expanded stage,and working surface reduced stage,puts forward the objective requirements of dynamic control of project team empowerment by analysis of work properties and resource acquisition conditions in different stage. Then,divides team development into five stages:formation stage,storming stage,execution stage,performing stage and adjourning stage,presents practical conditions of dynamic control of project team empowerment based on analysis of the change of competence,team communication and team culture.
出处 《建筑经济》 2016年第2期36-39,共4页 Construction Economy
基金 国家自然科学基金青年项目"建设工程项目经理人力资本贡献价值计量体系研究"(71001078) 国家自然科学基金面上项目"共同代理约束下工程项目经理授权赋能作用机理研究"(71371137)
关键词 工程项目 项目团队 授权赋能 动态调控 construction project project team empowerment dynamic control
  • 相关文献

参考文献13

  • 1Barner, R., Enablement.. The key of Empowerment[J]. Training and Development Journal, 1994 (7) .. 33-36.
  • 2雷巧玲.授权赋能研究综述[J].科技进步与对策,2006,23(8):196-199. 被引量:90
  • 3陈建安,胡蓓.团队授权目标及其实现策略研究[J].外国经济与管理,2006,28(4):15-20. 被引量:7
  • 4Gerwin, D. Team empowerment in new product development[J]. Business Horizons, 1999 (4) : 29-36.
  • 5Spreiter G M. Psychology empowerment in the workplace: Dimensions, measurement, and validation[J].Academy of Management Journal, 1995 (5): 1442-1462.
  • 6孙春玲,张华,李贺,宋红.基于共同代理框架的项目经理授权赋能研究[J].建筑经济,2012,33(6):31-34. 被引量:4
  • 7Maynard M T, Gilson L L and Manthieu J E. Empowermem -fad or fab? Amultilevel review of the past two decades of research[J].Journal of Management, 2012 (2) : 1230-1281.
  • 8Tuuli M M, Rowlinson S. What empowers individuals and teams in project? A critical incident analysis[J]. Engineering, Construction and Architectural Management, 2010 (1) : 9-20.
  • 9尹俊,王辉.组织内交换关系、心理授权与员工工作结果的研究[J].经济科学,2011(5):116-127. 被引量:2
  • 10Khalil Safari, Abdorahman Salim Haghighi, Abroad Rastegar, Akbar Jamshidi. The relationship between psychological empowerment and organizational learning[J]. Procedia-Social and Behavioral Sciences, 2011 (30) : 1147-1152.

二级参考文献94

  • 1翟学伟.人情、面子与权力的再生产——情理社会中的社会交换方式[J].社会学研究,2004(5):48-57. 被引量:522
  • 2雷巧玲.授权赋能研究综述[J].科技进步与对策,2006,23(8):196-199. 被引量:90
  • 3Aiken, L. S., & West, S. G., Multiple Regression: Testing and Interpreting Interactions [M], Newbury Park, CA, Sage. 1991.
  • 4Akerlof, G A., 1982, "Labor Contracts as Partial Gift Exchange" [J], The Quarterly Journal of Economics, Vol. 97, No.4, pp543-569.
  • 5Aselage, J., & Eisenberger, R., 2003, "Perceived Organizational Support and Psychological Contracts: A Theoretical Integration" [J], Journal of Organizational Behavior, Vol.24, No.5, pp491-509.
  • 6Avolio, B. J., Zhu, W., Koh, W., & Bhatia, P., 2004, "Transformational Leadership and Organizational Commitment: Mediating Role of Psychological Empowerment and Moderating Role of Structural Distance" [J], Journal of Organizational Behavior, Vol.25, No.8, pp951-968.
  • 7Bandura, A., 1989, "Human Agency in Social Cognitive Theory" [J], American Psychologist, Vol.44, No.9, pp1175-1184.
  • 8Blau, E M., Exchange and Power in Social Life [M], New York, Wiley. 1964.
  • 9Chen, G., & Klimoski, R. J., 2003, "The Impact of Expectations on Newcomer Performance in Teams as Mediated by Work Characteristics, Social Exchanges, and Empowerment" [J], The Academy of Management Journal, Vol.46, No.5, pp591-607.
  • 10Chen, Z. X., & Aryee, S., 2007, "Delegation and Employee Work Outcomes: An Examination of the Cultural Context of Mediating Processes in China" [J], The Academy of Management Journal, Vol.50, No.l, pp226-238.

共引文献104

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部