摘要
由于地下洞室内空间有限,而大型核岛设备尺寸较大,在受限的地下空间进行混凝土施工和大型设备安装,是地下核电厂建设可行性研究必须要解决的关键问题。针对地下核电厂混凝土施工及大型设备安装的特点,开展了地下核电厂房洞室混凝土衬砌、反应堆厂房安全壳混凝土施工和大型核岛设备安装的相关技术研究,首次提出了适合地下核电厂混凝土施工和大型设备安装的技术方案,并对相关技术方案实施的可行性进行了论证,为地下核电厂后续的研究和工程实践提供了理论依据。
Due to large size of nuclear island equipment and limited interior space of underground cave, so the concrete construction and large equipment installation in the limited space is the key problem to be solved in the feasibility study of underground nuclear power plants construction. In view of the features of concrete construction and large equipment installation for underground nuclear power plants, the research on technology of concrete construction of underground cavern lining and nuclear reactor containment as well as the installation of large - scale nuclear island equipment were carried out. And the technical solutions of concrete construction and large equipment installation were firstly proposed; the feasibility of relevant technical solutions implementation was also demonstrated, all of which can provide technical support for subsequent research and engineering practice of underground nuclear power plants.
出处
《人民长江》
北大核心
2016年第3期63-66,共4页
Yangtze River
基金
中国工程院重点咨询项目"核电站反应堆及带放射性的辅助厂房置于地下的可行性研究"(2013-XZ-20)
关键词
混凝土
大型设备安装
施工可行性分析
地下核电厂
concrete
large equipment installation
construction feasibility analysis
underground nuclear power plants