铁路明挖隧道与机场航站楼交叉同步施工技术 被引量:1

Cross synchronization construction technology of railway open trench tunnel and airport building
下载PDF
导出
摘要 结合新建郑州至新郑机场城际铁路地下段站前工程ZJZQ-IV标与郑州机场二期扩建工程T2航站楼立体交叉同步施工,对在黄河冲洪积平原含粉砂质地层中下部城铁隧道上部机场航站楼同步施工采取的隔离防护措施、施工技术方案进行研究,制定工程监测方法并对监测数据进行分析,验证施工可行性。 Combined with the newly built between zhengzhou xinzheng airport intercity railway station engineering, underground ZJZQ- IV standard and second phase expansion project of zhengzhou airport T2 terminal synchronous construction, interchanges in Huang Hechong diluvial plain to contain the upper rail tunnel in the silty sand layer texture part isolation protective measures taken by the airport terminal synchronous construction scheme, construction technology, formulate engineering monitoring method and analysis of monitoring data,verify the feasibility of construction.
作者 孙明超
出处 《中国建材科技》 2015年第6期96-97,共2页 China Building Materials Science & Technology
关键词 转换梁 贝雷架 止水隔断 填砂注浆 基坑监测 transfer beam bailey bracket water stop sand filling injection grouting foundation pit monitoring
  • 相关文献

参考文献2

二级参考文献3

  • 1中华人民共和国国家标准.GB50026-93工程测量规范[S].
  • 2冯慧君.深圳地铁明挖隧道基坑支护的施工与监测[M].2004.
  • 3中华人民共和国国家标准.JGJ/T8-97,建筑变形测量规范[S].

共引文献5

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部