期刊文献+

浅谈锦屏一级水电站推力轴承结构特点及安装工艺 被引量:3

On thrust bearing structure features and installation process of Jinping First Cascade Hydropower Station
下载PDF
导出
摘要 推力轴承是水轮发电机组核心装配部件之一,安装质量好坏直接影响到机组的安全、稳定运行。如何保证大型水轮发电机组推力轴承安装质量,是值得思考的问题。本文简述了锦屏一级水电站推力轴承安装工艺及调整方法。 Thrust bearing is one of the core assembly parts in hydroelectric generating set. The installation quality directly affects safe and stable operation of the unit. How to ensure the installation quality of thrust bearing in large hydroelectric generating set should be seriously considered. In the paper, thrust bearing installation process and adjusting method of Jinping First Cascade Hydropower Station are described.
作者 王轩 白钢
出处 《中国水能及电气化》 2016年第1期32-35,共4页 China Water Power & Electrification
关键词 推力轴承 结构特点 安装工艺 锦屏一级电站 thrust bearing structure characteristics installation process Jinping First Cascade Hydropower Station
  • 相关文献

参考文献2

共引文献5

同被引文献9

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部