摘要 针对承钢转炉煤气回收现状,分析了影响转炉煤气回收的主要因素,通过煤气柜进、出口管道连通,转炉煤气回收系统全面连通,转炉煤气掺入高炉煤气管道,以及转炉煤气用户开发四项措施,使得承钢转炉煤气吨钢回收量达到115m3/t。 The status of LDG recovery in Chenggang company was described. The affecting factors of LDG recovery were analyzed. The status of LDG recovery in Chenggang company was described. The affecting factors of LDG recovery were analyzed. The four measures, such as the pipe connected at the inlet and outlet of the gas tank, converter gas recovery system fully connected, converter gas mixed with blast furnace gas and converter gas user development make Chenggang converter gas recycled each tons of steel reached 115 m^3/t.
出处 《冶金能源》 2016年第1期52-54,共3页 Energy For Metallurgical Industry
关键词 转炉煤气回收 影响因素 措施 LDG recovery affecting factors measures