4Maher K, Tadros Joseth A, Steve Holdsworth. A new technique to continuity in prestressed concrete members[J]. PCI Journal,1993,(9-10):30-37.
5Joseph A Ficenec, Steven D Kneip, Maher K Tadros, Larry G Fischer. Prestressed spliced I-girders: Tenth Street Viaduct Project[J]. PCI Journal, 1993,(9-10):38-48.
6Alan R Phipps, Q D Spruill Jr. Biloxi Interstate 110 Voaduct[J]. PCI Journal, 1990,(1-2): 120-132.
7Peterman R J, Ramirez J A, restrained moments in bridges with full-span prestressed concrete form panels[J]. PCI Journal, 1998,(1-2):54-73.
8Hyo-Gyoung Kwak, Young-Jae Seo. Shrinkage cracking at interior support of continuous pre-cast pre-stressed concrete girder bridge[J]. construction and building materials , 2002,(16): 35-47.
9Hyo-Gyoung Kwak, Young-Jae Seo. Numerical analysis of time-dependent behavior of pre-cast pre-stressed concrete girder bridge[J]. construction and building materials , 2002,(16): 49-63.