期刊文献+

垂岸式集装箱码头自动化跨运车作业任务分派与序列优化 被引量:1

Scheduling automated straddle carrier at automated container terminals
下载PDF
导出
摘要 自动化跨运车(Automated Straddle Carrier,ASC)是一种自动化集装箱码头水平作业设备,可直接在岸桥下从地面存取集装箱,同时在堆场也可直接存取集装箱,其作业不会直接影响岸吊等其他设备的作业效率,具有独立性.考虑垂岸式集装箱堆场布局,以最小化完成时间和空驶时间为目标,建立ASC作业安排的混合整数规划模型,确定ASC的作业序列.根据数值实验结果,分析ASC数量配置的影响,以及完成时间和空驶时间之间的均衡关系. Automated straddle carriers(ASC)is an automated horizontal operating equipment for container terminal,which independently allows direct access to containers both under the shore bridge and the yard without directly affecting the operating efficiency of quay cranes and other equipment.The present study focuses on minimizing the completion and idle time considering the vertical layout of the container yard.The mixed-integer linear program model is established to arrange the ASC operation and determine its sequence.According to the results of numerical experiments,the impact of quantity allocation of ASC is analyzed along with the equilibrium relation between the completion time and idle time.
出处 《华中师范大学学报(自然科学版)》 CAS 北大核心 2016年第1期67-73,共7页 Journal of Central China Normal University:Natural Sciences
基金 国家自然科学基金青年项目(71101088) 国家自然科学基金面上项目(71471109) 上海市曙光计划项目(13SG48) 交通部应用基础研究项目(2015329810260)
关键词 自动化集装箱码头 自动化跨运车 混合整数规划 调度 automated container terminal automated straddle carrier mixed-integer linear program scheduling
  • 相关文献

参考文献16

  • 1LAU H Y K , ZHAO Y. Integrated scheduling of handling equipment at automated container terminals[J]. Internation- al Journal of Production Economics, 2008, 112(2): 665-682.
  • 2CAO J X, LEE I>H, CHEN J H, et al. The integrated yard truck and yard crane scheduling problem: genders' decompo- sition-based methods[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46 ( 3 ): 344 -353.
  • 3HOMAYOUIN S M, TANG S H, MOTLAGH O. A genet ic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated con- tainer terminals[J]. Journal o{ Computational and Applied Mathematics, 2014, 271)(42): 545-556.
  • 4Ll W, WU Y, PETERING M E H, et al. Discrete time model and algorithms {or container yard crane scheduling[J]. European Journal o{ Operational Research, 2009, 198 (1) : 165-172.
  • 5LI W, GOH M, WU Y, et al. A continuous time model for multiple yard crane scheduling with last minute job arrivals [J]. International Journal of Production Economics, 2012, 136(2) : 332-343.
  • 6GUO X, HUANG S Y, HSU W J, et al. Dynamic yard crane dispatching in container terminals with predicted vehi- cle arrival information[J]. Advanced Engineering Informat- ics, 2011, 25(3): 472-484.
  • 7李坤,唐立新,陈树发.多集装箱堆场空间分配与车辆调度集成问题的建模与优化[J].系统工程理论与实践,2014,34(1):115-121. 被引量:13
  • 8GELAREH S, MERZOUKI R, MCGINLEY K, et al. Scheduling of Intelligent and autonomous vehicles under pal ring/unpairing collaboration strategy in container terminals [J]. Transportation Research Part C: Emerging Technolo- gies, 2013, 33: 1-21.
  • 9CONFESSORE G, FABIANO M, LIOTTA G. A network flow based heuristic approach for optimising AGV move- ments[J]. Journal of Intelligent Manufacturing, 2011, 24 (2) : 405-419.
  • 10梁承姬,张松波.集装箱港口装卸作业设备集成调度[J].辽宁工程技术大学学报(自然科学版),2015,34(2):262-266. 被引量:5

二级参考文献26

  • 1Daganzo C F. Crane productivity and ship delay in ports[J].TRANSPORTATION RESEARCH RECORD,1989,(1251):1-9.
  • 2Kim K H. A crane scheduling method for port container terminals[J].European Journal of Operational Research,2004.752-768.
  • 3Lee D H,Wang H Q,Miao L X. Quay crane scheduling with non-interference constraints in port container terminals[J].Transportation Research Part E:Logistics and Transportation Review,2008,(01):124-135.
  • 4Lee D H,Cao Z,Meng Q. Scheduling of two-transtainer systems for loading outbound containers in port container terminals with simulated annealing algorithm[J].International Journal of Production Economics,2007,(01):115-124.
  • 5Zhang C Q,Liu J Y,Wan Y W. Storage space allocation in container terminals[J].Transportation Research Part B:Methodological,2003.883-903.
  • 6Kim K H,Kim H B. The optimal sizing of the storage space and handling facilities for import containers[J].Transportation Research Part B:Methodological,2002.821-835.
  • 7Ng W C. Crane scheduling in container yards with inter-crane interference[J].European Journal of Operational Research,2005.64-78.
  • 8Vis I F A. Minimum vehicle fleet size under time-window constraints at a container terminal[J].Transportation Science,2005,(02):249-260.
  • 9Kim K Y,Kim K H. A routing algorithm for a single straddle carrier to load export containers onto a containership[J].International Journal of Production Economics,1999.425-433.
  • 10Kim K H,Kim K Y. Routing straddle carriers for the loading operation of containers using a beam search algorithm[J].Computers & Industrial Engineering,1999.109-113.

共引文献16

同被引文献4

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部